Contract
Name
|
: |
Construction of 26
Residential Villas (G+01) Floor |
Client
|
: |
Utmost Properties
LLC |
Consultant
|
: |
Group Consult International
|
Duration
|
: |
12 months |
| Project
Value |
: |
AED 36.70 (US $ 10.03
million) |
| Scope
of Works |
: |
Construction &
Maintenance of 26 Villas (G+01) FloorsReinforced Concrete
Structure, Block Work for Walls, Metal Works, Aluminium
Double Glazed Windows & Doors, Floor, Wall, Gymnasium,
Ceiling Finishes, MEP & External Finishes, Swimming
Pool |
Contract
Name
|
: |
Construction of 2
Sheds (32 Nos. of Warehouse, G+M) Building |
Client
|
: |
Mr. Ahmed Salf Belhasa |
Consultant
|
: |
ACCESS Engineering
Consultancy |
Duration
|
: |
8 months |
| Project
Value |
: |
AED 16.13 million
(US $ 4.41 million) |
| Scope
of Works |
: |
Construction &
Maintenance of Warehouse (G+M) BuildingSupply &
Installation of Structural Steel, Reinforced Concrete
Structure, Block Work for Walls, Metal & Aluminium
Double Glazed Windows & Doors, Floor, Walls, Ceiling
Finishes, MEP & External Finishes
|
Contract
Name
|
: |
Construction of Labour
Camp (G+02) Building |
Client
|
: |
Mr. Nasser Saleh
Lootah |
Consultant
|
: |
HIGH ART Consultant
|
Duration
|
: |
8 months |
| Project
Value |
: |
AED 12.45 million
(US $ 3.4 million) |
| Scope
of Works |
: |
Construction &
Maintenance of Labour Camp (G+02) BuildingsReinforced
Concrete Structure, Installation of Hollow Core Slabs,
Block Work for Walls, Metal & Aluminium Double Glazed
Windows & Doors, Floor, Walls, Ceiling Finishes,
MEP & External Finishes |
|